| No | NIL-No | Name of NIL Holder | Status | Authorised Action | Location | Province |
| 1 | NIL-04 (Rev 2) | South African Nuclear Energy Corporation (Necsa) | Issued in April 2025 | Manufacturing of component and construction activities related to the extension of Thabana Pipe Store facility. | Pelindaba site | Gauteng |
| 2 | NIL-04 (Variation 5) | South African Nuclear Energy Corporation (Necsa) | Issued in September 2025 | Temporary increase in storage capacity of irradiated fuel elements in the SAFARI-1 reactor pool. | Pelindaba site | North West |
| Facility/Activity Inspected | Date of Inspection | Aim of Inspection | Summary of Inspection outcomes |
|---|---|---|---|
| UMET (NIL09) | Apr 2025 | Planned and unannounced inspection addressing – (i) Limits and Conditions of Operation (ii) Radiation Protection (iii) Emergency Planning and Preparedness (iv) LC in Part B of the Nuclear Licence | Three (3) findings and one observation were raised. |
| SAFARI-1 Research Reactor – (NIL-02) | Apr 2025 | Planned and announced inspection addressing compliance with Maintenance Schedules (RR-MPR-0002, RR-MPR-0003, RR-MPR-0004, RR-MPR-0005) and Operating Technical Specifications (RR-VSK-1000) during the reactor shutdown. | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. |
| A-West Drum Store (NIL-07) | Apr 2025 | Planned and announced inspection addressing – (i) Radiation Protection (ii) Limits and Conditions on Operation (iii) Decommissioning (iv) Funding for Decommissioning and Radioactive Waste (v) Organisational Capability and Management of Organisational Change (vi) Public Safety Information Forum (vii) Implementation of Written Instruction for all Operations that may Affect Nuclear Safety (viii) Radiation safety or Nuclear Security | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. |
| Area 74 Labs (NIL-10) | May 2025 | Planned and announced inspection addressing – (i) Radiation Protection (ii) Limits and Conditions on Operation (iii) Decommissioning (iv) Funding for Decommissioning and Radioactive Waste (v) Organisational Capability and Management of Organisational Change (vi) Public Safety Information Forum (vii) Implementation of Written Instruction for all Operations that may Affect Nuclear Safety, (viii) Radiation safety or Nuclear Security | Two (2) findings were raised. |
| Quarantine Store (NIL-12) | May 2025 | Planned and announced inspection addressing – (i) Radiological Protection (ii) Events (including Incidents or Accidents) on the Site (iii) Emergency Planning and Preparedness (iv) Safety Committee (v) Safety Documentation (vii) Display of Nuclear Installation License (viii) Transport (ix) Modification to the design of the Existing Plant or Facility | There were no findings raised but one (1) observation was raised. |
| Pel East Ponds (NIL-14) | May 2025 | Planned and announced inspection addressing – (i) Events Management (ii) Safety Documentation (iii) Operating Technical Specifications (iv) Radiological Protection (v) Safety Committee | There were no findings raised but one (1) observation was raised. |
| P-1500 Labs (NIL-33) | Apr 2025 | Planned and unannounced inspection addressing – (i) Decommissioning (ii) Funding for Decommissioning and Radioactive Waste (iii) Emergency Planning and Preparedness (iv) Environmental Protections (vi) Display of Nuclear License | Three (3) findings and one (1) observation were raised. |
| P-1900 Labs (NIL-36) | May 2025 | Planned and announced Inspection addressing – (i) Radiological Protection (ii) Care and Maintenance Plan (iii) Scope of actions (iv) Limits and Conditions on Operations (v) Medical Surveillance and Health Register (vi) Decommissioning (vii) HIRA (viii) Emergency Planning and Preparedness (ix) Documents, records, authorities, and certificates | Four (4) findings and two (2) observations were raised. |
| NTP (NIL-39) | Jun 2025 | Planned and announced Inspection addressing – (i) Radiological Protection (ii) Medical Surveillance | There were no findings raised but one (1) observation was raised. |
| NTP (NIL-39) | May 2025 | Planned and announced Inspection addressing . Examination, Inspection, Maintenance and Testing | Five (5) findings and two (2) observations were raised. |
| LETF (NIL-41) | Jun 2025 | Planned and announced Inspection addressing – (i) Examination, Inspection, Maintenance and Testing (EIMT) | There were no findings raised but six (6) observations were raised. |
| SAFARI-1 Research Reactor: (NIL-02) | May 2025 | Planned and announced Inspection addressing – (i) LC 7: Restrictions on dealing with the site (ii) LC 11: Documents, Records Authorities and Certificates | Two (2) findings and one (1) observation were raised. |
| SAFARI-1 Research Reactor: (NIL-02) | May 2025 | Planned and announced Inspection addressing – LC 22: Examination, Inspection, Maintenance and Testing | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. |
| Area 26 (NIL-29) | May 2025 | Planned and announced Inspection addressing – (i) LC 3: Scope of Actions (ii) LC 7: Restrictions on Dealing with the Site (iii) LC 9: Medical Surveillance and Health Register (iv) LC 12: Events Management (v) LC 13: Emergency Planning and Preparedness (vi) LC 14: Environmental Protection (vii) LC 30: Implementation of Written Instructions for all Operations that may affect Nuclear Safety, Radiation Safety or Nuclear Security. | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. |
| Environmental Management Group | May 2025 | Planned and announced Inspection addressing – (i) Management of Radioactive Effluent & Discharges at the Pelindaba Site (ii) Management of Radioactive Emissions on the Pelindaba Site (iii) Radiological Environmental Surveillance at Pelindaba Site & Vicinity | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. |
| Thabana Complex (NIL-04) | May 2025 | Planned and unannounced Inspection addressing – (i) Limits and Conditions on Operations (ii) Events Management | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. |
| Pelstore (NIL-11) | May 2025 | Planned and announced Inspection addressing – (i) Operating Technical Specification (ii) Documents and Record Management (iii) Restrictions on Dealing with the Site. | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. |
| P2800 (NIL-27) | May 2025 | Planned and announced Inspection addressing: (i) Scope of actions that may be undertaken in the facility. (ii) Radiological Protection (iii) Care and Maintenance Plan (iv) Documents, records, authorities, and certificates (v) Emergency Planning and Preparedness (vi) Environmental protection (vii) Decommissioning (viii) HIRA | Three (3) findings and one (1) observation were raised. |
| B1 Basement (NIL-42) | May 2025 | Planned and announced Inspection addressing: (i) Scope of actions that may be undertaken in the facility. (ii) Radiological Protection (iii) Care and Maintenance Plan (iv) Documents, records, authorities, and certificates (v) Emergency Planning and Preparedness (vi) Environmental protection (vii) Decommissioning (viii) HIRA | Five (5) findings and two (2) observations were raised. |
| Cal Pads (NAPP-02) | May 2025 | Planned and announced Inspection addressing – (i) Radiological Protection (ii) Emergency Planning and Preparedness (iii) Environmental protection (iv) Decommissioning. | Three (3) findings were raised. |
| UChem (NIL-03) | May 2025 | Planned and announced Inspection addressing – (i) Duly Authorised and Suitable Qualified and Experienced Persons (ii) Safety Committee | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. |
| YM-Vacuum (NIL-34) | May 2025 | Planned and announced Inspection addressing – (i) Scope of actions that may be undertaken in the facility. (ii) Radiological Protection (iii) Care and Maintenance Plan (iv) Documents, records, authorities, and certificates (v) Emergency Planning and Preparedness (vi) Environmental protection (vii) Decommissioning (viii) HIRA | Five (5) findings were raised. |
| RadAnal Labs (NIL-37) | May 2025 | Planned and announced Inspection addressing – (i) Scope of Actions (ii) Radiation Protection (iii) Organisational Capability and Management of Organisational Change (iv) Decommissioning (v) Radioactive Waste Management. | Three (3) findings were raised. |
| Pelindaba Analytical Laboratories (NIL-40) | May 2025 | Planned and announced Inspection addressing – (i) PAL-NIL40-PRG-0001: Radiological Surveillance and Control Programme for the PAL & NFP Laboratories in Building B-E1 (ii) Radioactive Waste Management (iii) Environmental Protection (iv) Events Management | Two (2) findings were raised. |
| Emergency Services | May 2025 | Planned and announced Inspection addressing – (i) Inspection and Maintenance on Emergency Vehicles and Equipment (ii) Control of Inspection, Measuring and Test Equipment (iii) Control Over Radioactive Sources (iv) Facilities and equipment used in the ECC. | Five (5) findings were raised. |
| Area 16 (NIL-18) | May 2025 | Planned and announced Inspection addressing – (i) Scope of actions that may be undertaken in the facility. (ii) Radiological Protection (iii) Care and Maintenance Plan (iv) Documents, records, authorities, and certificates (v) Emergency Planning and Preparedness (vi) Environmental protection (vii) Decommissioning (viii) HIRA | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection |
| SAFARI-1 Research Reactor (NIL-02) | Jun 2025 | Planned and announced Inspection addressing -(i) Operating Technical Specifications (ii) Examination of a candidate Shift Supervisor | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. |
| ElProd (NIL-08) | May 2025 | Planned and announced Inspection addressing – (i) OTS (ii) SQEP | One (1) finding was raised. |
| A8 Decon Services (NIL-06) | Jun 2025 | Planned and announced Inspection addressing – (i) Worker Radiation Protection Programme (ii) Follow-up on non-compliances from previous inspections | One (1) finding and one (1) observation were raised. |
| H-Building CAM (NIL-35) | Jun 2025 | Planned and unannounced Inspection addressing – (i) Radiological Protection (ii) Care and Maintenance Plan (iii) Scope of actions (iv) Limits and Conditions on Operations (v) Medical Surveillance and Health Register (vi) Decommissioning (vii) HIRA (viii) Emergency Planning and Preparedness (ix) Documents, records, authorities, and certificates | Five (5) findings were raised. |
| A8 Decon Services (NIL-06) | Jun 2025 | Unplanned and announced Inspection addressing – The inspection was conducted following the reported incident from the facility | Five (5) findings were raised. |
| De-Heeling (NIL-20) | Jun 2025 | Unplanned and announced Inspection addressing – The inspection was conducted following the reported incident from the facility | Two (2) findings were raised. |
| BEVA K3 Stores (NIL-17) | Jul 2025 | Planned and announced inspection addressing – (i) LC 3: Scope of Actions (ii) LC 4: Demarcation of Site Boundary, Site Plans, Designs and Specifications (ii) LC 8: Radiological Protection (iv) LC 11: Documents, Records, Authorities and Certificates (v) Part B: Specified NNR Requirements | One (1) finding and no (0) observations were raised. |
| Vaalputs (NIL28) | Jul 2025 | Planned and announced inspection addressing – (i) Licence Condition 7: Restrictions on Dealing with the Site (ii) Licence Condition 8: Radiological Protection (iii) Licence Condition 9: Medical Surveillance and Health Register (iv) Licence Condition 12: Events on the Site (v) Licence Condition 13: Emergency Planning and Preparedness (vi) Licence Condition 22: Examination, Inspection, Maintenance and Testing (vii) Conduct of Operations | One (1) finding and no (0) observations were raised. |
| Bus Shed Complex (NIL-13) | Jul 2025 | Planned and unannounced inspection addressing – Radioactive Waste Management. • Decommissioning • Limits and Conditions on Operations. • Radiological Protection • Medical Surveillance and Health Register. • Transport • Security • Events | Five (5) finding and no (0) observations were raised. |
| P-1900 Labs (NIL-36) | Jul 2025 | Planned and announced inspection addressing – Scope of Actions (i) Medical Surveillance and Health Register. (ii) Emergency Planning and Preparedness. (iii) Organisational Capability and Management of Organisational Change. | Two (2) finding and no (0) observations were raised. |
| SAFARI-1 (NIL-02) | Jul 2025 | Planned and announced inspection addressing – Facility Maintenance Schedules (RR-MPR-0003, RR-MPR-0004, RR-MPR-0005) Operating Technical Specifications (RR-VSK-1000) during the August 2025 reactor shutdown. | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded. |
| FDL (NIL-38) | Jul 2025 | Planned and announced inspection addressing – Facility Maintenance Schedules (RR-MPR-0003, RR-MPR-0004, RR-MPR-0005) Operating Technical Specifications (RR-VSK-1000) during the August 2025 reactor shutdown. | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded. |
| H-Building (NIL-35) | Jul 2025 | Planned and announced inspection addressing – Facility Specific Procedures: (i) AC-VHBLIC-PRG-08001: Radiological Surveillance and Control Program for the Applied Chemistry Laboratories in V-H Building. (ii) Environmental Protection. (iii) Radioactive Waste Management. (iv) Safety and Security Culture Enhance Process. (v) Organisational Capability and Management of Organisational Change. | Two (2) finding and no (0) observations were raised. |
| J-Building (NIL-21) | Aug 2025 | Planned and announced inspection addressing – (i) Care and Maintenance Plan (ii) Scope of Actions (iii) Radioactive Waste Management (iv) Decommissioning (v) Funding for Decommissioning and Radioactive Waste (vi) Restrictions on Dealing with the Site (vii) Events, (including Incidents or Accidents) (viii) Safety committee (ix) Demarcation of Site Boundary, Plans, Design and Specification. (x) Radiological Protection | Eight (8) finding and no (0) observations were raised. |
| D-Building (NIL-22) | Aug 2025 | Planned and announced inspection addressing – (i) Display of the Nuclear Installation Licence (ii) Limits and Conditions on Operations (iii) Decommissioning (iv) Events, (including Incidents or Accidents) (v) Radiological protection (vi) Modification to Design of Existing Plant or Facility (vii) Scope of Actions (viii) Medical Surveillance and Health Register (ix) Emergency Planning and Preparedness | Eleven (11) finding and two (2) observations were raised. |
| NTP (NIL-39) | Aug 2025 | Planned and announced inspection addressing – Examination, Inspection, Maintenance and Testing best practices. | One (1) finding and no (0) observations were raised. |
| P-2700 Complex (NIL-03) | Aug 2025 | Planned and announced inspection To verify compliance of UCHEM with EIMT and Funding for Decommissioning and Radioactive Waste, detailed in SHEQ-INS docs, Licence condition as well as facility specific documentation. | Two (2) finding and two (2) observations were raised. |
| E-Building (NIL-30) | Aug 2025 | Planned and announced inspection addressing – (i) Scope of actions that may be undertaken in the facility. (ii) Radiological Protection. (iii) Care and Maintenance Plan. (iv) Organisational Capability and Management of Organisational Change (v) Funding for Decommissioning and Radioactive Waste (vi) Part-B of NIL-30 | Eight (8) finding and five (5) observations were raised. |
| Dorbyl Camp (NIL-31) | Aug 2025 | Planned and announced inspection addressing – (i) Scope of actions that may be undertaken in the facility. (ii) Radiological Protection. (iii) Care and Maintenance Plan. (iv) Organisational Capability and Management of Organisational Change (v) Funding for Decommissioning and Radioactive Waste (vi) Part-B of NIL-30 | Nine (9) finding and two (2) observations were raised. |
| P-16000 Laboratories (NIL-37) | Aug 2025 | Planned and announced inspection addressing – (i) Examination, Inspection, Maintenance and Testing. (ii) Radiological Protection. (iii) Safety and Security Culture Enhancement Process. (iv) Duly Authorised and Suitably Qualified and Experienced Persons. (v)Events on the Site. | One (1) finding and no (0) observations were raised. |
| PAL (NIL-40) | Aug 2025 | Planned and announced inspection addressing – (i) NIL-40: Nuclear Installation Licence. (ii) Operating Technical Specification. (iii)Safety Committee. (iv) Safety Documentation. (v) Duly Authorised and Suitably Qualified and Experienced Persons. | Four (4) finding and no (0) observations were raised. |
| Area 21 (NIL-16) | Aug 2025 | Planned and announced inspection The purpose of this report is to document the outcomes of the NNR inspection conducted at Area 21 storage facility. The inspection was to verify compliance of the facility with the – (i) Events, (including Incidents or Accidents) on the Site. (ii) Radiological protection. (iii) Safety documentation. (iv) Medical Surveillance and Health Register. (v) Restrictions on Dealing with the Site. (vi) Demarcation of Site Boundary, Site Plans, Designs and Specifications. (vii) Radioactive waste management. | Four (4) finding and one (1) observation were raised. |
| Thabana Complex (NIL-04) | Aug 2025 | Planned and announced inspection The purpose of this report is to document the outcomes of the NNR inspection conducted at Thabana. The inspection was to verify compliance of the facility during the Ponds 3 and 4 Capping project and associated SHEQ-INS and facility specific documentation: (i) Environmental protection. (ii) Radioactive waste management. (iii) Duly Authorised and Suitably Qualified and Experienced Persons. (iv) Implementation of written instruction. (v) Radiation protection. (vi) Project (Conditions pertaining to Pond 3 capping) | Five (5) finding and two (2) observations were raised. |
| Area 14 Waste Man Complex (NIL-11) | Aug 2025 | Planned and announced inspection The purpose of the inspection was to verify compliance with: (i) X-Ray Radiological protection. (ii) Examination, Inspection, Maintenance and Testing. (iii) Construction and commissioning of plant or process. (iv) Conditions pertaining to X-Ray commissioning. (v) X-Ray OTS | Two (2) finding and one (1) observation were raised. |
| C-Building (NIL-23) | Aug 2025 | Planned and announced inspection The purpose of this report is to document the outcomes of the NNR inspection conducted at C-Building. The inspection was to verify compliance of the facility with the following NIL conditions and associated SHEQ-INS and facility specific documentation: (i) Scope of actions that may be undertaken in the facility (ii) Care and Maintenance Plan. (iii) Funding for Decommissioning and Radioactive Waste (iv) Organisational Capability and Management of Organisational Change (v) Part B of NIL23 | Four (4) Findings and 3 three observations were raised. |
| SAFARI-1 (NIL-02) | Aug 2025 | Planned and announced inspection The purpose of the inspection was to verify compliance of the facility to the following conditions of authorisation: (i) LC 8: Radiological Protection (ii) LC 9: Medical Surveillance and Health Register | Four (4) findings and no (0) observations were raised. |
| SAFARI-1 (NIL-02) | Aug 2025 | Planned and announced inspection The purpose of the inspection was to verify compliance of the facility to the following conditions of authorisation: (i) LC 8: Radiological Protection (ii) LC 9: Medical Surveillance and Health Register | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded. |
| A8 Decontamination Facility (NIL-06) | Aug 2025 | Planned and announced inspection The purpose of this report is to document the outcomes of the NNR Inspection conducted at the A-8 Decontamination Facility. The inspection aimed to verify compliance with the following areas using facility-specific documentation and associated SHEQ-INS: (i) Medical Surveillance and Health Register. (ii) Decommissioning. (iii) Environmental Protection (iv) Quality, Security and Safety Management (v) Radiation Protection, Workplace Monitoring. | Three (3) finding and no (0) observations were raised. |
| SAFARI-1 (NIL-02) | Aug 2025 | Planned and announced inspection To verify compliance with the following license condition and associated SHEQ-INS and facility specific documentation LC-16: Safety Committees. | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded. |
| SAFARI-1 (NIL-02) | Aug 2025 | Planned and announced inspection The purpose of the inspection was to verify compliance of the facility to the following conditions of authorisation: (i) LC 25: Organisational Capability and Management of Organisational Change (ii) LC 27: Public Safety Information Forum (iii) LC 29: Display of the Nuclear Installation License | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded. |
| Oil Purification Facility (NIL-15) | Aug 2025 | Planned and announced inspection The purpose of this report is to document the outcomes of an NNR inspection conducted at NTP on 28 September 2025. The aim of the inspection was to assess whether systems, processes and agreements were in place and effectively implemented to ensure compliance with Care and Maintenance best practices. | No findings but one (1) observation. |
| X-Building (NIL-32) | Aug 2025 | Planned and announced inspection The purpose of this report is to document the outcomes of the NNR inspection conducted at X-Building. The inspection was to verify compliance of the facility with the following NIL conditions and associated SHEQ-INS and facility specific documentation: (i) Scope of authorised activities (ii) Radiation Protection (iii) Care and Maintenance Plan (iv) Authorised Activities (v) Decommissioning Funds (vi) Events Management (vii) Demarcation of Site Boundary, Site Plans, Designs and Specifications (viii) Restrictions on Dealing with the Site | Seven (7) findings and three (3) observations were raised. |
| BEVA Evaporation Ponds (NIL-26) | Aug 2025 | Planned and announced inspection The purpose of the inspection was to verify compliance with the following NIL-26 Licence Conditions and associated SHEQ-INS and facility-specific documentation: (i) Radiological Protection, (ii) Care and Maintenance, (iii) Demarcation of Site Boundary, Site Plans, Designs and Specifications | Seven (7) findings and three (3) observations were raised. |
| Area 27 De-Heeling (NIL-20) | Aug 2025 | Planned and announced inspection The purpose of this report is to document the outcomes of the NNR inspection conducted at Area 27 De-Heeling Facility. The inspection was to verify compliance of the facility with the following NIL conditions and associated SHEQ-INS and facility specific documentation: (i) Radioactive Waste Management (ii) Decommissioning (iii) Funding for Decommissioning and Radioactive Waste (iv) OTS (v) Events | Nine (9) findings and three (3) observations were raised. |
| Area 40 Complex (NIL-19) | Sep 2025 | Planned and announced inspection addressing – (i) Scope of actions that may be undertaken in the facility (ii) Radiological Protection. (iii) Access and Egress. (iv) Safety Committee and Safety Documentation. (v) Emergency Planning and Preparedness. (vi) NIL-19 | Two (2) finding and no (0) observations were raised. |
| LETF Complex (NIL-41) | Sep 2025 | Planned and announced inspection addressing – NIL-41 Licence Conditions and associated SHEQ-INS and facility-specific documentation. | Four (4) finding and one (1) observation were raised. |
| ELPROD (NIL-08) | Sep 2025 | Planned and announced inspection addressing – Medical Surveillance and Health Register, Examination, Inspection, Maintenance and Testing, Restrictions on Dealing with the Site. | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded. |
| UMET (NIL-09) | Sep 2025 | Planned and announced inspection addressing – Environmental Protection, EIMT detailed in SHEQ-INS series and facility specific documents as well as facility specific documentation. | One (1) finding and two (2) observations were raised. |
| HEU Vault – K0090 (NIL-05) | Sep 2025 | Planned and announced inspection To document the outcomes of the inspections conducted at AZF Facility on 29 August 2025. The purpose of the said inspection was to verify compliance of AZF with Operational Technical Specification (OTS), Safety Assessment Report (SAR), Access and Egress, Radiation Protection as well as Safety Management principles determined for the facility. | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded. |
| NTP Radiochemicals Complex (NIL-39) | Sep 2025 | Planned and announced inspection The NNR conducted an inspection at NTP Radiochemical Complex (P-1701) from 11, 12 and 15 to 17 September 2025. The purpose of this report is to document the outcomes of Page 7 of 24 Inspection Number: INS-NTWP-0440 COMPLIANCE ASSURANCE INSPECTION REPORT the NNR inspection conducted at NTP Radiochemical Complex (P-1701). The aim of the inspection was to assess whether systems, processes and agreements were in place and effectively implemented to ensure compliance with the following NIL- conditions and associated SHEQ-INS and facility specific documentation: (i) Scope of authorised activities (ii) Quality, Security and Safety Management (iii) Safety Documentation (iv) Radiation Protection (v) Transport (vi) Modification to Design of Existing Plant or Facility (vii) Emergency Planning & Preparedness (viii) Decommissioning (ix) Safety Committees (x) Environmental Protection (xi) Radioactive Waste Management (xii) Self-Inspection Programme | Five (5) findings and six (6) observations were raised. |
| NTP Radiochemicals Complex (NIL-39) | Sep 2025 | Planned and announced inspection The purpose of the inspection was to verify compliance to NIL-39 Licence Condition 5: Physical Security and associated SHEQ-INS and facility specific requirements. | There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded. |