Protecting persons,
property and the environment
Protecting persons,
property and the environment

2026/2027 KOEBERG NPP

NIL No Name of NIL Holder Status Authorised Action Location Province
NVL-31 Variation 0 Eskom Issued 21 July 2026 The transport of unirradiated fuel to Koeberg Nuclear Power Station. Cape Town Western Cape

Facility/Activity InspectedDate of InspectionAims of InspectionSummary of Inspection outcomes
Maintenance and Inservice Inspection05 Mar – 06
Apr 2026
Planned and announced inspection verifying compliance to LC
15 focusing whether the licensee’s programme is in accordance with licence and regulatory requirements as it relates to Civil Monitoring.
Nineteen observations related to Inspection Programme, Inspection, Maintenance and Monitoring, Problem Identification and
Resolution, and Documentation
Modification to design of plant01 to 28 April
2026
Planned and announced inspection verifying compliance to LC 12 focusing on Nuclear Authorisation Holder programmatic controls for accomplishing changes, modifications, and repairs.Three non-compliances were raised related to
Installation Inspection, and Procedure Administration

Fifteen observations were raised related to Design Inspection, Testing Inspection, Problem Identification and Resolution, and
Documentation
Maintenance and Inservice Inspection09 – 10 May
2026
Planned and announced inspection verifying compliance to LC
15 focusing on whether In-Service Testing regulatory requirements and licensee commitments are being met for the valves.
No non-compliances or observations were raised in this inspection.
Scope of Actions that may be undertaken01 May – 23
June 2026
Planned and announced inspection verifying compliance to LC 4 to ascertain the adequacy and implementation of licensee procedures and administrative requirements for the conduct of core unloading operations and plant conditions during core
unloading.
Three observations related to Administrative Controls, Implementation of Controls and Problem Identification and Resolution
Maintenance and Inservice Inspection01 May – 24
June 2026
Planned and announced inspection verifying compliance to LC
15 focusing on whether In-Service Testing regulatory requirements and licensee commitments are being met for the pumps.
Two non-compliances were raised related to Procedure Administration
Maintenance and Inservice Inspection01 May – 26
June 2026
Planned and announced inspection verifying compliance to LC
15 focusing on the tools, gauges, instruments, and other measuring and testing devices are properly controlled and maintained, to ensure total accuracy for the pumps.
One observation related to the calibration of equipment
Authorised and qualified persons13 May – 22
June 2026
Planned and announced inspection verifying compliance to LC
20 focusing on whether non-permanent employees (contractors) performing activities affecting nuclear safety at Koeberg Nuclear Power Station are appropriately authorised, qualified, trained, supervised, and controlled in accordance with applicable licence conditions, regulatory requirements, quality assurance standards, and station procedures.
Two non-compliance were raised related to Supervision and Oversight and Procedure Usability & Documentation

Three observations were raised related to Authorisation of Contractors, Nuclear Project Management and Procedure Usability
Radiation Protection08 – 18 June
2026
Planned and announced inspection verifying compliance to LC 5 focusing on the safety, security and control of radioactive sources.Two non-compliances related to Storage Requirements, and Procedure Administration.

Six observations related to Programme
administration, Storage Requirements, and Leak Tests.
Transport12 – 24 June
2026
Planned and announced inspection verifying compliance to LC 10 focusing on the effectiveness of the licensee’s programs for processing, handling, storage, and transportation of radioactive material.One non-compliance related to procedure usability.
Organisational Changes04 – 15 June
2026
Planned and announced inspection verifying compliance to LC 23 focusing on the evaluation of the effective implementation of the Organisational Change programme and review of the Periodic Safety Review Deviation actions.Six non-compliances were raised related to Programme Administration, Procedure Administration, Documentation and Problem Identification and Resolution.

Three observations were raised related to
Programme Administration.
Events On site01 – 17 June
2026
Planned and unannounced inspection verifying compliance to LC 27 to evaluate the effectiveness of the licensee’s problem identification and resolution program in identifying, prioritising, evaluating, and correcting problems.One non-compliance was raised related to Procedure Usability.

Three observations were raised related to
Problem Identification and Resolution and Procedure Administration

There were no regulatory warnings and directives issued during Q2 of 2026/27.

There were no Emergency Exercise Reports for 2026-2027.

2025/2026 KOEBERG NPP

NIL No Name of NIL Holder Status Authorised Action Location Province
NIL-01 (Variation 22) Eskom Koeberg Issued in November 2025 20 year long term operation license for Koeberg Unit 2 Cape Town Western Cape
NL-44 (Variation 5) Eskom Koeberg Issued in April 2026 Variation 5 of NL-44 for the Transient Interim Storage Facility (TISF) Cape Town Western Cape

Facility/Activity InspectedDate of InspectionAims of InspectionSummary of Inspection outcomes[i] and Grading of Inspection Findings
Maintenance and Inservice InspectionFeb – Apr 25Planned and announced inspection verifying compliance to LC 15 focusing on the performance of the requalification of the Liquid Penetrant Examination procedure. One non-compliance was raised related to procedure administration.
Twelve observations were raised related to surface examinations, problem identification and resolution and procedure administration
Maintenance and Inservice InspectionFeb – Jun 25Planned and announced inspection verifying compliance to LC 15 focusing on whether In-Service Testing regulatory requirements and licensee commitments are being met for the valves.One observation was raised related to the testing of the valves.
Maintenance and Inservice InspectionFeb – June 25Planned and announced inspection verifying compliance to LC 15 focusing on the tools, gauges, instruments, and other measuring and testing devices are properly controlled and maintained, to ensure total accuracy for the valves.Two observations were raised related to calibration equipment and review of record.
Maintenance and Inservice InspectionFeb – Jun 25Planned and announced inspection verifying compliance to LC 15 focusing on whether In-Service Testing regulatory requirements and licensee commitments are being met for the pumps.Three observations were raised related to test results and review of record.
Maintenance and Inservice InspectionFeb – Jun 25Reactive inspection verifying compliance to LC 15 focusing on the tools, gauges, instruments, and other measuring and testing devices are properly controlled and maintained, to ensure total accuracy for the pumps.No non-compliances or observations were raised
Display of Nuclear Installation Licence Apr-25Planned and unannounced inspection verifying compliance to LC 29 focusing on the display of Nuclear Installation Licence to ensure public access to the licence conditionsOne observation was raised related to inconsistencies in display of licences NIL-01 and NIL-44.
Radioactive Waste ManagementMay-25Planned and announced inspection verifying compliance to LC 7 focusing on the:
(i)     adequacy of the implementation of the provisions related to Radioactive Waste Management.
(ii)   effectiveness of the licensee’s programs for processing, handling, and storage of Radioactive Waste
Three non-compliances were raised related to procedure administration, procedure, usability and records management.
Events on SiteJun-25Planned and unannounced inspection verifying compliance to LC 27 focusing on the effectiveness of the licensee’s problem identification and resolution program in identifying, prioritising, evaluating, and correcting problems.Eleven observations were raised related to problem identification and resolution and procedure administration.
Modification to Design of PlantJun-25Planned and announced inspection verifying compliance to LC 12 focusing on:
(i)     The implementation of programmatic controls for accomplishing design changes, modifications, and repairs.
(ii)    Verification that modified systems and components are ready for start-up, operation and shutdown of the plant.
(iii)   Verification that modifications have been properly designed, installed, inspected, and tested to ensure the adequate performance of the modified systems and components without compromising design margins
Eight non-compliances were raised related to Modification Control Program Administration, Procedure usability, Problem Identification and Resolution and documentation management.
Radiological ProtectionJun-25Planned and announced inspection verifying compliance to LC 5 focusing on the:
(i)     adequacy of the licensee’s personal dosimetry for internal and external exposure.
(ii)   capability to control internal and external occupational exposure during normal operations.
One non-compliance was raised related to records management. Eight observations were raised related to radiation monitoring requirements and problem identification and resolution.
Ageing Management and Long-Term OperationJun-25Planned and announced inspection verifying compliance to LC 16 focusing on the: (i)     implementation of ageing management programme (AMP119)
(ii)    material condition of the systems, structures and components that require an ageing management review, maintenance.
(iii) management of records.
One non-compliance was raised related to procedure administration.
Seven observations were raised related surveillance and inspection, and procedure administration.
Dealing with SiteJun-25Planned and announced inspection verifying compliance to LC 19 focusing on the Koeberg Plant Induction Training material for employees who are working at Koeberg unaccompanied if it does cover the requirements/aspects associated with safety and emergency preparedness.Three observations were raised related to emergency evacuation plans and exit points.
Modification to Design of PlantApr – Jul 25Reactive inspection verifying compliance to Licence Condition 12 focusing on:
(i)     The implementation of programmatic controls for accomplishing design changes, modifications, and repairs.
(ii)    Verification that modified systems and components are ready for start-up, operation and shutdown of the plant.
(iii)   Verification that modifications have been properly designed, installed, inspected, and tested to ensure the adequate performance of the modified systems and components without compromising design margins.
No non-compliances were raised.

Fifteen observations were raised related to problem identification and resolution, procedure usability and documentation
Radiological ProtectionAug-25Planned and announced inspection verifying compliance to Licence Condition 5 focusing on the adequacy of the licensee’s respiratory protection program for Radiation Protection.Seven non-compliances were raised related to requirements for respiratory protection (emergencies), procedure administration, procedure usability and documentation.
Four observations were raised related to requirements for respiratory protection (medical screening of respirator users, supervision and training, maintenance of respiratory protective equipment), and documentation.
Maintenance and Inservice InspectionJun – Sep 25Planned and announced inspection verifying compliance to Licence Condition focusing on whether the licensee adequately performed, reviewed, and evaluated operational containment tests local leak rate test (LLRT) for operational plant.No non-compliances were raised.
Two observations were raised related to test results and procedure administration. One observation related to test results was closed during the inspection.
Maintenance and Inservice InspectionJun – Sep 25Planned and announced inspection verifying compliance to Licence Condition 15 focusing on the tools, gauges, instruments, and other measuring and testing devices are properly controlled and maintained, to ensure total accuracy for the valves.No non-compliances or observations were raised in this inspection.
Maintenance and Inservice InspectionAug – Sep 25Planned and announced inspection verifying compliance to Licence Condition 15 focusing on whether In-Service Testing regulatory requirements and licensee commitments are being met for valves.No non-compliances or observations were raised in this inspection.
Emergency Planning and PreparednessAug – Sep 25Planned and unannounced inspection verifying compliance to Licence Condition 8 focusing on the adequacy of the implementation of the provisions related to Radiological Emergency Response Training (Onsite).Seven observations were raised related to Radiological Emergency Response Training
TransportSep-25Planned and announced inspection verifying compliance to Licence Condition 10 focusing on the effectiveness of the licensee’s programs for processing, handling, storage, and transportation of radioactive material (Onsite). Two non-compliances were raised related to measuring and test equipment and problem identification and resolution.
Three observations were raised related to procedure usability and documentation.
Scope of Activities that may be Undertaken Aug – Sep 25Planned and announced inspection verifying compliance to Licence Condition 4 focusing on the:
·       adequacy of licensee procedures for the conduct of core reload operations.
·       adequacy of the licensee’s administrative requirements for control of:
a)     Core reload operations.
b)     Plant conditions during core reload.
Two observations were raised related to inspection planning,
Scope of Activities that may be UndertakenSep-25Planned and announced inspection verifying compliance to Licence Condition 4 focusing on whether refuelling activities specified in the Technical Specifications (TS) have been completed and whether refuelling activities are being controlled and conducted as required by TS and approved procedures.Two observations were raised related to inspection planning,
Events on SiteAug – Sep 25Planned and unannounced inspection verifying compliance to Licence Condition 27 focusing on the effectiveness of the licensee’s problem identification and resolution program in identifying, prioritising, evaluating, and correcting problems.One non-compliance was raised related to procedure administration.
Two observations were raised related to problem identification and resolution
Modification to Design of PlantMar – Sep 25Reactive inspection verifying compliance to NNR Directive issued on 6 May 2025 related Licence Condition 12 focusing on:
(i)     The implementation of programmatic controls for accomplishing design changes, modifications, and repairs.
(ii)    Verification that modified systems and components are ready for start-up, operation and shutdown of the plant.
(iii)   Verification that modifications have been properly designed, installed, inspected, and tested to ensure the adequate performance of the modified systems and components without compromising design margins.
Two observations were raised related to problem identification and resolution
Physical SecurityAug – Sep 25Planned and announced inspection verifying compliance to Licence Condition 18 focusing on the: effective implementation of the licensee’s nuclear security measures in place that are required to minimize the opportunity for unauthorized removal of radioactive sources in use and or in storage.Three non-compliances were raised related to procedure administration and documentation. One non-compliance related to documentation was closed during the inspection.
Eight observations were raised related to programme administration, categorisation of radioactive sources, procedure administration, and documentation .
Limits and Conditions on OperationAug – Sep 25Planned and announced inspection verifying compliance to LC 14 evaluating whether the licensee operates the plant safely and reliably, and operational surveillance and other activities are performed in conformance with license conditions, regulatory requirements, and licensee commitmentsTwo non-compliances were raised related to Documentation
One observation was raised related to Operations Procedures and Records.
Maintenance and Inspection ServiceSep – Oct 25Planned and announced inspection verifying compliance to LC 15 focusing on assessing the effectiveness of the licensees’ program for assessing the welds on vital system boundaries as it relates to the replacement steam generators.Two non-compliances were raised related to procedure administration
Eight observations were raised related to Written Procedure Requirements, Examinations, Evaluation, Procedure Administration and Procedure Usability.
Maintenance and Inspection ServiceMar – Oct 25Reactive inspection verifying compliance to LC 15 focusing on assessing the effectiveness of the licensees’ program for assessing the welds on vital system boundaries as it relates to the replacement steam generators.Two observations related to Personnel and Procedure Demonstration.
Maintenance and Inservice InspectionOct-25Planned and announced inspection verifying compliance to LC 15 focusing on whether In-Service Testing regulatory requirements and licensee commitments are being met for the valves.No non-compliances or observations were raised in this inspection.
Maintenance and Inservice InspectionOct-25Planned and announced inspection verifying compliance to LC 15 focusing on whether In-Service Testing regulatory requirements and licensee commitments are being met for the valves.No non-compliances or observations were raised in this inspection.
Maintenance and Inservice InspectionOct-25Reactive inspection verifying compliance to LC 15 focusing on whether In-Service Testing regulatory requirements and licensee commitments are being met for the valves.No non-compliances or observations were raised in this inspection.
Ageing Management and Long-Term OperationOct – Dec 25Planned and announced inspection verifying compliance to LC 16 focusing on the material condition of the systems, structures and components (SSCs) that require an ageing management review, that are adequately maintained consistently.One non-compliance was raised related to Procedure Administration.
Three observations were raised related to surveillance and inspection.
Environmental Protection and Effluent ManagementNov – Dec 25Planned and announced inspection verifying compliance to LC 6 focusing on effective implementation of the radiological environmental monitoring programme.Five non-compliances were raised related to Land use census, Procedure Administration, Procedure Usability and Documentation.
Six observations were raised related to Operational Environmental Surveillance Program, Disposal of Samples, Procedure Administration and Documentation.
Authorised and Qualified PersonsSep, Oct, Dec 25Planned and announced inspection verifying compliance to LC 4 focusing on the:
·       Outage 127 refueling operation that was in progress
·       Outage 127 preparation for dilution to criticality phase
·       Unit flux mapping, thermal power measurement
Three observations were raised related to Conduct of Operators and Control Room Environment and Procedure Administration.
Maintenance and Inservice InspectionOct – Nov 25Reactive inspection verifying compliance to LC 15 focusing on whether maintenance activities for structures, systems, and components (SSCs) are being conducted in a manner that results in the reliable and safe operation of the plant.Two non-compliances were raised related to Procedure Administration.
One observation related to Documentation.
Scope of Activities that may be UndertakenNov – Dec 25Planned and announced inspection verifying compliance to LC 4 focusing on the calculation of core thermal power and that the procedures used are technically adequate (Unit 2)Three observations were raised related to Core Performance Data Evaluation, Procedure Usability and Documentation.
Radiological ProtectionDec-25Planned and announced inspection verifying compliance to LC 4 focusing on the: plant walkdown to establish licensee’s implementation of the radiation protection program is in accordance with license and regulatory requirements.One non-compliance was raised related to Procedure Usability.
Four observations were raised related to House Keeping, Contamination, lack of consistency in labelling bags, and Oil Storage Room Capacity.
Documents and RecordsDec-25Reactive inspection verifying compliance to LC 22 focusing the Nuclear Authorisation holder’s processes used to ensure the effective implementation of RD-0034, “Quality and Safety Management Requirements for Nuclear Installations”, section 7.3, “General Requirements on Documentation”Four non-compliances were raised related to Procedure Usability and Documentation of which two were graded yellow and two green.
One observation was raised related to Documentation.
Scope of Activities that may be UndertakenDec-25Planned and announced inspection verifying compliance to LC 4 focusing on the calculation of core thermal power and that the procedures used are technically adequate (Unit 1)Two observations related Core Performance Data Evaluation and Procedure Usability tracked under Unit 2
Radiological Protection Feb-26Planned and announced inspection verifying compliance to LC 5 focusing on the: safety security and control of radioactive sources that are maintained at a high level through prescribed requirements and guiding regulations.Four non-compliances were raised related to Administrative Controls, Marking and Labelling of Sources, Procedure Usability
Seven observations were raised related to Categorisation System for Radioactive Sources, Administrative Controls, Marking and Labelling of Sources, Procedure Usability and Documentation
Public Communication and Information Dissemination Feb-26Reactive inspection related to LC 28 in evaluating the effective implementation of Public Safety Information Forum (PSIF) at Koeberg Nuclear Power Station as it relates to information sharing/communication with the members of the public.Three non-compliances were raised related to Public Safety Information Forum Programme
One observation was raised related to Public Safety Information Forum Programme
Emergency Preparedness and ResponseFeb-26Planned and announced inspection verifying compliance to LC 8 focusing on the review and adequacy of the implementation of the provisions related to Emergency Planning and Preparedness at Koeberg Nuclear Power Station as documented in the Regulatory Requirements Document.Seven non-compliances were raised related to Emergency Facilities and Equipment, Protective Response (Urgent Protective Actions), Procedure Administration, Procedure Usability
Two observations were raised related to Emergency Facilities and Equipment, Protective Response (Urgent Protective Actions),
Maintenance and Inservice InspectionOct 25 – Feb 26Planned and announced inspection verifying compliance to LC 15 focusing on whether In-Service Testing regulatory requirements and licensee commitments are being met for the valve’s requalification.No non-compliances or observations were raised in this inspection.
Maintenance and Inservice InspectionOct 25 – Feb 26Planned and announced inspection verifying compliance to LC 15 focusing on whether the licensee adequately performed, reviewed, and evaluated operational containment tests local leak rate test (LLRT) requalification for operational plant.No non-compliances or observations were raised in this inspection.
Maintenance and Inservice InspectionOct 25 – Feb 26Planned and announced inspection verifying compliance to LC 15 focusing on the maintenance activities for CSR, SR and other safety significant structures, systems, and components (SSCs) are being conducted in a manner that results in reliable safe operation of the plant and plant equipment.Five observations related to Corrective Maintenance Programme, Problem Identification and Resolution and Procedure Usability.
Scope of Actions that may be UndertakenMar-26Planned and announced inspection verifying compliance to LC 4 focusing on whether the licensee’s programme is in accordance with licence and regulatory requirements.Seventeen observations were raised related to Inspection Planning, Inspection, Maintenance and Monitoring Programme linked to the integrity verification of the spent fuel casks, Problem Identification and Resolution, Procedure Administration, Procedure Usability and Documentation.
Safety AssessmentFeb – Mar 26Planned and announced inspection verifying compliance to LC 11 focusing on whether the licensee’s implementation of the standard process is in accordance with licence and regulatory requirements.Five non-compliances were raised related to Procedure Administration and Procedure Usability.
One observation was raised related to Programme Administration.
Scope of Actions that may be UndertakenMar-26Planned and announced inspection verifying compliance to LC 4 to ascertain the adequacy of the licensee’s administrative requirements regarding the fuel element storage limits as it pertains to dry storage limits and storage limits in units 1 and 2 spent fuel pools. Three observations were raised related to Programme Administration and Documentation
Quality and Safety Management Mar-26Planned and announced inspection verifying compliance to LC 21 focusing on the: effective implementation of a nuclear safety cultureSix non-compliances were raised related to Problem Identification and Resolution.
Two observations were raised related to Nuclear Safety Culture Administration Program.

Title Description
Radiography-related instruction to Eskom The NNR also issued an instruction to Eskom in response to recurring radiography-related incidents during the maintenance window of Outage 227. Because these incidents created a risk of uncontrolled worker exposure, the NNR directed Eskom to suspend all radiography interventions until it had demonstrated that the root causes had been identified and that appropriate corrective actions had been implemented. The suspension was later lifted.
NNR Enforcement Notice TlCR Amendment to directive – EERI mod 12008 hardened water supply timelines
NNR Directive Non-compliance with to NIL-01 Licence Condition 12.2
Non-compliance with NNR Long Term Operation (LTO) Directive The functionality of the Hardened Water System is dependent on the successful implementation of both the Hardened Water Supply (Modification 12008) and Hardened Water Connection points (Modification 12004) modifications. Eskom failed to complete the online scope of the EERI Modification 12004, “Hardened Water Connection Points” by 31 October 2025 as was committed in the LTO safety case resulting in a non-compliance authorisation condition.
20 Year Long Term Operations (LTO) licence for Koeberg Unit 2 The NNR Board of Directors approved on 6 November 2025 a 20 year long term operations (LTO) licence for Koeberg Unit 2. NIL-01, Variation 22 authorises the operation of Unit 2 for an additional 20-year period of extended operation..

There were Emergency Exercise Reports for 2025-2026.

HEAD OFFICE

Eco Glades Office Park
Eco Glades 2Block G
Witch Hazel Avenue
Highveld Ext 75
Eco Park
Centurion

Telephone: +27 (12) 674 7100

Facsimile: +27 (12) 663 5513

E-mail: enquiry@nnr.co.za

CAPE TOWN

12 Raats Drive
Delphi Arch Building
Tableview
Cape Town
7441

P.O. Box 46055
Kernkrag
7441

Telephone: +27 (21) 553 9500

Regulatory Emergency Response Centre

Tel: +27 (12) 674 7120 (during response)

Fax: 086 742 6038

 

Stay connected