Protecting persons,
property and the environment
Protecting persons,
property and the environment

2025/2026 NECSA

Approved Amendment Of Certificate to the Nuclear License for the SAFARI-1 Research Reactor(COR)
No # NIL No Name of NIL Holder Status Authorised Action Location Province
1 NIL-02 (Variation 5) South African Nuclear Energy Corporation (Necsa) Issued in September 2025 Temporary increase in storage capacity of irradiated fuel elements in the SAFARI-1 reactor pool Pelindaba site North West
Approved Proposed Extension of Thabana Pipestore
NIL-NoNAME OF NIL HOLDERSTATUSAUTHORISED ACTIONLocationPROVINCE
NIL-04 (Rev 2)NecsaIssued in April 2025Manufacturing of component and construction activities related to the extension of Thabana Pipe Store facility.Pelindaba siteGauteng

Facility/Activity InspectedDate of InspectionAims of InspectionSummary of Inspection outcomes and Grading of Inspection Findings
UMET (NIL09)Apr-25Planned and unannounced inspection addressing:
(i) Limits and Conditions of Operation
(ii) Radiation Protection
(iii) Emergency Planning and Preparedness
(iv) LC in Part B of the Nuclear License
Three (3) findings and one observation were raised
SAFARI-1 Research Reactor (NIL-02)Apr-25Planned and announced inspection addressing compliance with Maintenance Schedules (RR-MPR-0002, RR-MPR-0003, RR-MPR-0004, RR-MPR-0005) and Operating Technical Specifications (RR-VSK-1000) during the reactor shutdown.There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection
A-West Drum Store (NIL-07)Apr-25Planned and announced inspection addressing:
(i) Radiation Protection
(ii) Limits and Conditions on Operation
(iii) Decommissioning
(iv) Funding for Decommissioning and Radioactive Waste
(v) Organisational Capability and Management of Organisational Change
(vi) Public Safety Information Forum
(vii) Implementation of Written Instruction for all Operations that may Affect Nuclear Safety
(viii) Radiation safety or Nuclear Security
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection
Area 74 Labs (NIL-10) May-25Planned and announced inspection addressing:
(i) Radiation Protection
(ii) Limits and Conditions on Operation
(iii) Decommissioning
(iv) Funding for Decommissioning and Radioactive Waste
(v) Organisational Capability and Management of Organisational Change
(vi) Public Safety Information Forum
(vii) Implementation of Written Instruction for all Operations that may Affect Nuclear Safety,
(viii) Radiation safety or Nuclear Security
Two (2) findings were raised
Quarantine Store (NIL-12)May-25Planned and announced inspection addressing:
(i) Radiological Protection
(ii) Events (including Incidents or Accidents) on the Site
(iii) Emergency Planning and Preparedness
(iv) Safety Committee
(v) Safety Documentation
(vi) Physical Security
(vii) Display of Nuclear Installation License
(viii) Transport
(ix) Modification to the design of the Existing Plant or Facility
There were no findings raised but one (1) observation was raised
Pel East Ponds (NIL-14)May-25Planned and announced inspection addressing:
(i) Events Management
(ii) Safety Documentation
(iii) Operating Technical Specifications
(iv) Radiological Protection
(v) Safety Committee
There were no findings raised but one (1) observation was raised
P-1500 Labs (NIL-33)Apr-25Planned and unannounced inspection addressing:
(i)  Decommissioning
(ii)  Funding for Decommissioning and Radioactive Waste
(iii) Emergency Planning and Preparedness
(iv) Environmental Protections
(v) Physical Security
(vi) Display of Nuclear License
Three (3) findings and one (1) observation were raised
P-1900 Labs (NIL-36)May-25Planned and announced Inspection addressing:
(i) Radiological Protection
(ii) Care and Maintenance Plan
(iii) Scope of actions
(iv) Limits and Conditions on Operations
(v) Medical Surveillance and Health Register
(vi) Decommissioning
(vii) HIRA
(viii) Emergency Planning and Preparedness
(ix) Documents, records, authorities, and certificates
Four (4) findings and two (2) observations were raised
NTP (NIL-39)Jun-25Planned and announced Inspection addressing:
(i) Radiological Protection
(ii) Medical Surveillance
There were no findings raised but one (1) observation was raised
NTP (NIL-39)May-25Planned and announced Inspection addressing Five (5) findings and two (2) observations were raised
Examination, Inspection, Maintenance and Testing
LETF (NIL-41)Jun-25Planned and announced Inspection addressing There were no findings raised but six (6) observations were raised
(i) Examination, Inspection, Maintenance and Testing (EIMT)
SAFARI-1 Research Reactor (NIL-02)May-25Planned and announced Inspection addressing:
(i) LC 7: Restrictions on dealing with the site
(ii) LC 11: Documents, Records Authorities and Certificates
Two (2) findings and one (1) observation were raised
SAFARI-1 Research Reactor (NIL-02)May-25Planned and announced Inspection addressing LC 22: Examination, Inspection, Maintenance and TestingThere were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection
Area 26 (NIL-29)Jun-25Planned and announced Inspection addressing:
(i) LC 3: Scope of Actions
(ii) LC 7: Restrictions on Dealing with the Site
(iii) LC 9: Medical Surveillance and Health Register
(iv) LC 12: Events Management
(v) LC 13: Emergency Planning and Preparedness
(vi) LC 14: Environmental Protection
(vii) LC 30: Implementation of Written Instructions for all Operations that may affect Nuclear Safety, Radiation Safety or Nuclear Security.
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection
Environmental Management GroupMay-25Planned and announced Inspection addressing:
(i) Management of Radioactive Effluent & Discharges at the Pelindaba Site
(ii) Management of Radioactive Emissions on the Pelindaba Site
(iii) Radiological Environmental Surveillance at Pelindaba Site & Vicinity
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection
Thabana Complex (NIL-04)May-25Planned and unannounced Inspection addressing:
(i) Limits and Conditions on Operations
(ii)   Events Management
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection
Pelstore (NIL-11)May-25Planned and announced Inspection addressing:
(i) Operating Technical Specification
(ii) Documents and Record Management
(iii) Restrictions on Dealing with the Site.
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection
P2800 (NIL-27)May-25Planned and announced Inspection addressing:
(i) Scope of actions that may be undertaken in the facility.
(ii) Radiological Protection
(iii) Care and Maintenance Plan
(iv) Documents, records, authorities, and certificates
(v) Emergency Planning and Preparedness
(vi) Environmental protection
(vii) Decommissioning
(viii) HIRA
Three (3) findings and one (1) observation were raised
B1 Basement (NIL-42)May-25Planned and announced Inspection addressing:
(i) Scope of actions that may be undertaken in the facility.
(ii) Radiological Protection
(iii) Care and Maintenance Plan
(iv) Documents, records, authorities, and certificates
(v) Emergency Planning and Preparedness
(vi) Environmental protection
(vii) Decommissioning
(viii) HIRA
Five (5) findings and two (2) observations were raised
Cal Pads (NAPP-02)May-25Planned and announced Inspection addressing:
(i) Radiological Protection
(ii) Emergency Planning and Preparedness
(iii) Environmental protection
(iv) Decommissioning.
Three (3) findings were raised
UChem (NIL-03)May-25Planned and announced Inspection addressing:
(i) Duly Authorised and Suitable Qualified and Experienced Persons
(ii)   Safety Committee
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection
YM-Vacuum (NIL-34)May-25Planned and announced Inspection addressing:
(i) Scope of actions that may be undertaken in the facility.
(ii) Radiological Protection
(iii) Care and Maintenance Plan
(iv) Documents, records, authorities, and certificates
(v) Emergency Planning and Preparedness
(vi) Environmental protection
(vii)  Decommissioning
(viii) HIRA
Five (5) findings were raised
RadAnal Labs (NIL-37)May-25Planned and announced Inspection addressing:
(i) Scope of Actions
(ii)  Radiation Protection
(iii) Organisational Capability and Management of Organisational Change
(iv) Decommissioning
(v) Radioactive Waste Management.
Three (3) findings were raised
Pelindaba Analytical Laboratories (NIL-40)May-25Planned and announced Inspection addressing:
(i) PAL-NIL40-PRG-0001: Radiological Surveillance and Control Programme for the PAL & NFP Laboratories in Building B-E1
(ii) Radioactive Waste Management
(iii) Environmental Protection
(iv) Events Management
Two (2) findings were raised
Emergency ServicesMay-25Planned and announced Inspection addressing:
(i) Inspection and Maintenance on Emergency Vehicles and Equipment
(ii) Control of Inspection, Measuring and Test Equipment
(iii) Control Over Radioactive Sources
(iv) Facilities and equipment used in the ECC.
Five (5) findings were raised
Area 16 (NIL-18)May-25Planned and announced Inspection addressing:
(i) Scope of actions that may be undertaken in the facility.
(ii) Radiological Protection
(iii) Care and Maintenance Plan
(iv) Documents, records, authorities, and certificates
(v) Emergency Planning and Preparedness
(vi) Environmental protection
(vii) Decommissioning
(viii) HIRA
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection
SAFARI-1 Research Reactor (NIL-02)Jun-25Planned and announced Inspection addressing:
(i) Operating Technical Specifications
(ii) Examination of a candidate Shift Supervisor
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection.
ElProd (NIL-08)May-25Planned and announced Inspection addressing:
(i) OTS
(ii) SQEP
One (1) finding was raised
A8 Decon Services (NIL-06)Jun-25Planned and announced Inspection addressing:
(i) Worker Radiation Protection Programme
(ii) Follow-up on non-compliances from previous inspections
One (1) finding and one (1) observation were raised
H-Building CAM (NIL-35)Jun-25Planned and unannounced Inspection addressing:
(i) Radiological Protection
(ii) Care and Maintenance Plan
(iii) Scope of actions
(iv) Limits and Conditions on Operations
(v) Medical Surveillance and Health Register
(vi)      Decommissioning
(vii) HIRA
(viii) Emergency Planning and Preparedness
(ix) Documents, records, authorities, and certificates
Five (5) findings were raised
A8 Decon Services (NIL-06)Jun-25Unplanned and announced Inspection addressingFive (5) findings were raised
The inspection was conducted following the reported incident from the facility
De-Heeling (NIL-20)Jun-25Unplanned and announced Inspection addressingTwo (2) findings were raised
The inspection was conducted following the reported incident from the facility
BEVA K3 Stores (NIL-17)Jul-25Planned and announced inspection addressing:
(a) LC 3: Scope of Actions
(b) LC 4: Demarcation of Site Boundary, Site Plans, Designs and Specifications
(c) LC 8: Radiological Protection
(d) LC 11: Documents, Records, Authorities and Certificates
(e) Part B: Specified NNR Requirements
One (1) finding and no (0) observations were raised.
Bus Shed Complex (NIL-13)Jul-25Planned and unannounced inspection addressing – Radioactive Waste Management.Five (5) finding and no (0) observations were raised.
• Decommissioning
• Limits and Conditions on Operations.
• Radiological Protection
• Medical Surveillance and Health Register.
• Transport
• Security
• Events
J-Building (NIL-21)Aug-25Planned and announced inspection addressing – 1. Care and Maintenance Plan
2. Scope of Actions
3. Radioactive Waste Management
4. Decommissioning
5. Funding for Decommissioning and Radioactive Waste
6. Restrictions on Dealing with the Site
7. Events, (including Incidents or Accidents)
8. Safety committee
9. Demarcation of Site Boundary, Plans, Design and Specification.
10. Radiological Protection
Eight (8) finding and no (0) observations were raised.
D-Building (NIL-22)Aug-25Planned and announced inspection addressing:
1. Display of the Nuclear Installation Licence
2. Limits and Conditions on Operations
3. Decommissioning
4. Events, (including Incidents or Accidents)
5. Radiological protection
6. Modification to Design of Existing Plant or Facility
7. Scope of Actions
8. Medical Surveillance and Health Register
9. Emergency Planning and Preparedness
Eleven (11) finding and two (2) observations were raised.
P-1900 Labs (NIL-36)Jul-25Planned and announced inspection addressing – Scope of Actions
• Medical Surveillance and Health Register.
• Emergency Planning and Preparedness.
• Organisational Capability and Management of Organisational Change.
Two (2) finding and no (0) observations were raised.
NTP (NIL-39)Aug-25Planned and announced inspection addressing – Examination, Inspection, Maintenance and Testing best practices.One (1) finding and no (0) observations were raised.
Area 40 Complex (NIL-19)Sep-25Planned and announced inspection addressing: (a) Scope of actions that may be undertaken in the facility
(b) Radiological Protection.
(c) Access and Egress.
(d) Safety Committee and Safety Documentation.
(e) Emergency Planning and Preparedness.
(f) NIL-19
Two (2) finding and no (0) observations were raised.
LETF Complex (NIL-41)Sep-25Planned and announced inspection addressing – NIL-41 Licence Conditions and associated SHEQ-INS and facility-specific documentation.Four (4) finding and one (1) observation were raised.
P-2700 Complex (NIL-03)Aug-25Planned and announced inspection Two (2) finding and two (2) observations were raised.
To verify compliance of UCHEM with EIMT and Funding for Decommissioning and Radioactive Waste, detailed in SHEQ-INS docs, Licence condition as well as facility specific documentation.
ELPROD (NIL-08)Sep-25Planned and announced inspection addressing – Medical Surveillance and Health Register,There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded
Examination, Inspection, Maintenance and Testing, Restrictions on Dealing with the site.
UMET (NIL-09)Sep-25Planned and announced inspection addressing – Environmental Protection, EIMT detailed in SHEQ-INS series and facility specific documents as well as facility specific documentation.One (1) finding and two (2) observations were raised.
E-Building (NIL-30)Aug-25Planned and announced inspection addressing – (a) Scope of actions that may be undertaken in the facility.
(b) Radiological Protection.
(c) Care and Maintenance Plan.
(d) Organisational Capability and Management of Organisational Change (e) Funding for Decommissioning and Radioactive Waste
(f) Part-B of NIL-30
Eight (8) finding and five (5) observations were raised.
Dorbyl Camp (NIL-31)Aug-25Planned and announced inspection addressing – (a) Scope of actions that may be undertaken in the facility.
(b) Radiological Protection.
(c) Care and Maintenance Plan.
(d) Organisational Capability and Management of Organisational Change (e) Funding for Decommissioning and Radioactive Waste
(f) Part-B of NIL-30
Nine (9) finding and two (2) observations were raised.
SAFARI-1 (NIL-02)Jul-25Planned and announced inspection addressing – Facility Maintenance Schedules (RR-MPR-0003, RR-MPR-0004, RR-MPR-0005) Operating Technical Specifications (RR-VSK-1000) during the August 2025 reactor shutdown.There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded
FDL (NIL-38)Jul-25Planned and announced inspection addressing: • Restrictions on Dealing with the Site.
• Radiological Protection.
• Radioactive Waste Management.
• Emergency Planning and Preparedness..
Two (2) finding and no (0) observations were raised.
H-Building (NIL-35)Jul-25Planned and announced inspection addressing – Two (2) finding and no (0) observations were raised.
Facility Specific Procedures:
• AC-VHBLIC-PRG-08001: Radiological Surveillance and Control Program for the Applied Chemistry Laboratories in V-H Building.
• Environmental Protection.
• Radioactive Waste Management.
• Safety and Security Culture Enhance Process.
• Organisational Capability and Management of Organisational Change.
P-16000 Laboratories (NIL-37)Aug-25Planned and announced inspection addressing: • Examination, Inspection, Maintenance and Testing.
• Radiological Protection.
• Safety and Security Culture Enhancement Process.
• Duly Authorised and Suitably Qualified and Experienced Persons.
• Events on the Site.
One (1) finding and no (0) observations were raised.
PAL (NIL-40)Aug-25Planned and announced inspection addressing: • NIL-40: Nuclear Installation Licence.
• Operating Technical Specification.
• Safety Committee.
• Safety Documentation.
• Duly Authorised and Suitably Qualified and Experienced Persons.
Four (4) finding and no (0) observations were raised.
Area 21 (NIL-16)Aug-25Planned and announced inspectionFour (4) finding and one (1) observation were raised.
The purpose of this report is to document the outcomes of the NNR inspection conducted at Area 21 storage facility. The inspection was to verify compliance of the facility with the:
• Events, (including Incidents or Accidents) on the Site.
• Radiological protection.
• Safety documentation.
• Medical Surveillance and Health Register.
• Restrictions on Dealing with the Site.
• Demarcation of Site Boundary, Site Plans, Designs and Specifications.
• Radioactive waste management.
Thabana Complex (NIL-04)Aug-25Planned and announced inspectionFive (5) finding and two (2) observations were raised.
The purpose of this report is to document the outcomes of the NNR inspection conducted at
Thabana. The inspection was to verify compliance of the facility during the Ponds 3 and 4
Capping project and associated SHEQ-INS and facility specific documentation:
• Environmental protection.
• Radioactive waste management. • Duly Authorised and Suitably Qualified and Experienced Persons.
• Implementation of written instruction.
• Radiation protection.
• Project (Conditions pertaining to Pond 3 capping)
Area 14 Waste Man Complex (NIL-11)Aug-25Planned and announced inspection:
The purpose of the inspection was to verify compliance with:
• X-Ray Radiological protection.
• Examination, Inspection, Maintenance and Testing.• Construction and commissioning of plant or process.
• Conditions pertaining to X-Ray commissioning.
• X-Ray OTS
Two (2) finding and one (1) observation were raised.
C-Building (NIL-23)Aug-25Planned and announced inspection.
The purpose of this report is to document the outcomes of the NNR inspection conducted at C-Building. The inspection was to verify compliance of the facility with the following NIL conditions and associated SHEQ-INS and facility specific documentation:
(a) Scope of actions that may be undertaken in the facility
(b) Care and Maintenance Plan.
(c) Funding for Decommissioning and Radioactive Waste
(d) Organisational Capability and Management of Organisational Change
(e) Part B of NIL23
Four (4) Findings and 3 three observations were raised
SAFARI-1 (NIL-02)Aug-25Planned and announced inspection:
The purpose of the inspection was to verify compliance of the facility to the following conditions of authorisation:
(a) LC 8: Radiological Protection
(b) LC 9: Medical Surveillance and Health Register
Four (4) findings and no (0) observations were raised.
SAFARI-1 (NIL-02)Aug-25Planned and announced inspection:
The purpose of the inspection was to verify compliance to Licence Condition 5: Physical Security and associated SHEQ-INS and facility specific processes.
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded
A8 Decontamination Facility (NIL-06)Aug-25Planned and announced inspection:
The purpose of this report is to document the outcomes of the NNR Inspection conducted at the A-8 Decontamination Facility. The inspection aimed to verify compliance with the following areas using facility-specific documentation and associated SHEQ-INS:
• Medical Surveillance and Health Register.
• Decommissioning.
• Environmental Protection
• Quality, Security and Safety Management
• Radiation Protection, Workplace Monitoring.
Three (3) finding and no (0) observations were raised.
SAFARI-1 (NIL-02)Aug-25Planned and announced inspection:
To verify compliance with the following license condition and associated SHEQ-INS and facility specific documentation LC-16: Safety Committees.
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded
SAFARI-1 (NIL-02)Aug-25Planned and announced inspection.
The purpose of the inspection was to verify compliance of the facility to the following conditions of authorisation:
(a) LC 25: Organisational Capability and Management of Organisational Change
(b) LC 27: Public Safety Information Forum
(c) LC 29: Display of the Nuclear Installation Licence
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded
HEU Vault – K0090 (NIL-05)Sep-25Planned and announced inspectionThere were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded
To document the outcomes of the inspections conducted at AZF Facility on
29 August 2025. The purpose of the said inspection was to verify compliance of AZF with Operational Technical Specification (OTS), Safety Assessment Report (SAR), Access and Egress, Radiation Protection as well as Safety Management principles determined for the facility.
Oil Purification Facility (NIL-15)Aug-25Planned and announced inspectionNo findings but one (1) observation.
The purpose of this report is to document the outcomes of an NNR inspection conducted at NTP on 28 September 2025. The aim of the inspection was to assess whether systems, processes and agreements were in place and effectively implemented to ensure compliance with Care and Maintenance best practices.
BEVA Evaporation Ponds (NIL-26)Aug-25Planned and announced inspectionSeven (7) findings and three (3) observations were raised.
The purpose of the inspection was to verify compliance with the following NIL-26 Licence Conditions and associated SHEQ-INS and facility-specific documentation:
• Radiological Protection,
• Care and Maintenance,
• Demarcation of Site Boundary, Site Plans, Designs and Specifications
X-Building (NIL-32)Aug-25Planned and announced inspectionThree (3) findings and three (3) observations were raised.
The purpose of this report is to document the outcomes of the NNR inspection conducted at
X-Building. The inspection was to verify compliance of the facility with the following NIL conditions and associated SHEQ-INS and facility specific documentation:
a) Scope of authorised activities
b) Radiation Protection
c) Care and Maintenance Plan d) Authorised Activities
e) Decommissioning Funds
f) Events Management
g) Demarcation of Site Boundary, Site Plans, Designs and Specifications
h) Restrictions on Dealing with the Site
Area 27 De-Heeling (NIL-20)Aug-25Planned and announced inspectionNine (9) findings and three (3) observations were raised.
The purpose of this report is to document the outcomes of the NNR inspection conducted at Area 27 De-Heeling Facility. The inspection was to verify compliance of the facility with the following NIL conditions and associated SHEQ-INS and facility specific documentation:
• Radioactive Waste Management
• Decommissioning
• Funding for Decommissioning and Radioactive Waste
• OTS
• Events
NTP Radiochemicals Complex (NIL-39) Sep-25Planned and announced inspectionFive (5) findings and six (6) observations were raised.
The NNR conducted an inspection at NTP Radiochemical Complex (P-1701) from 11, 12 and 15 to 17 September 2025. The purpose of this report is to document the outcomes of Page 7 of 24
Inspection Number: INS-NTWP-0440
COMPLIANCE ASSURANCE INSPECTION REPORT the NNR inspection conducted at NTP Radiochemical Complex (P-1701). The aim of the inspection was to assess whether systems, processes and agreements were in place and effectively implemented to ensure compliance with the following NIL- conditions and associated SHEQ-INS and facility specific documentation:
a) Scope of authorised activities
b) Quality, Security and Safety Management
c) Safety Documentation
d) Radiation Protection
e) Transport
f) Modification to Design of Existing Plant or Facility
g) Emergency Planning & Preparedness
h) Decommissioning
i) Safety Committees
j) Environmental Protection
k) Radioactive Waste Management
l) Self-Inspection Programme
NTP Radiochemicals Complex (NIL-39)Sep-25Planned and announced inspectionThere were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were no identified findings or observations the inspection outcomes were not graded
Area 26 (NIL-29)Oct-25The purpose of the planned and unannounced inspection was to verify compliance to the following Licence Conditions and associated SHEQ-INS and facility specific processes:
(a) LC 3: Scope of Actions
(b) LC 8: Radiological Protection
(c) LC 12: Events on the Site
(d) LC 20: Construction and Commissioning of Plant or Process
(e) LC 29: Display of Nuclear Installation Licence.
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were neither findings nor observations identified, the inspection outcomes were not graded.
SAFARI-1 RR (NIL-02)Oct-25The purpose of the planned and announced inspection was to verify compliance with the facility Maintenance Schedules (RR-MPR-0003, RR-MPR-0004, RR-MPR-0005) and Operating Technical Specifications (RR-VSK-1000) during the October 2025 reactor shutdown.Three (3) findings and no (0) observations were raised.
A-West Drum Store (NIL-07)Oct-25The purpose planned and announced inspection was to verify compliance of A-West Drum Store Facility with regards to the following requirements:
1. Scope of Actions
2. Demarcation of Site Boundary, Site Plans, Designs and Specifications
3. Restrictions on Dealing with the Site
4. Radioactive waste management
5. Events
6. Safety committee
7. Safety Documentation
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were neither findings nor observations identified, the inspection outcomes were not graded.
Area 14 Waste Management Complex (NIL-11)Oct-25The purpose planned and announced inspection was to verify compliance of the facility with the following NIL conditions and associated SHEQ-INS and facility specific documentation:
• Emergency Planning and Preparedness.
• Environmental protection.
• Display of the Nuclear Installation Licence.
Four (4) findings and one (1) observation were raised.
Thabana Complex (NIL-04)Oct-25The purpose planned and announced inspection was to verify compliance of the facility with the following NIL- conditions and associated SHEQ-INS and facility specific documentation:
• Examination, Inspection, Maintenance and Testing.
• Radiological protection.
• Decommissioning.
Five (5) findings and no (0) observations were raised.
LEMS (NIL-41)Oct-25 The aim of the planned and announced inspection was to verify compliance of the facility with the following NIL-41 conditions and associated
SHEQ-INS and facility-specific documentation:
• Safety Culture
• Environmental protection
• Medical health surveillance
• Quality and Safety Management
• Radiological Protection
• Radioactive Waste Management
• Emergency
• Safety Documentation.
• Decommissioning
• Self-Inspection Programme
• Scope of Actions
• Modification to Design of Existing Plant or Facility
• SHEQ Management System.
Thirty-one (31) findings and eight (8) observations were raised.
NTP (NIL-39)Nov-25The aim of the planned and announced inspection was to assess whether systems, processes and agreements were in place and effectively implemented to ensure compliance with the following areas:
• Scope of Actions
• Operational Technical Specifications
• Public Safety Forum.
Two (2) findings and two (2) observations were raised.
UMET (NIL-09)Nov-25The aim of the planned and announced inspection was to verify compliance of UMET Facility with Funding for Decommissioning and Radioactive Waste, Safety Documentation, Financial Security and Radioactive Waste Management principles detailed in the SHEQ-INS-series and facility specific documentation.Four (4) findings and one (1) observation were raised.
ELPROD (NIL-08)Nov-25The aim of the planned and announced inspection was to verify compliance of ELPROD Facility with Environmental Protection, EIMT detailed in SHEQ-INS series and facility specific documents as well as facility specific documentation.Five (5) findings and one (1) observation were raised.
PAL (NIL-40)Nov-25The aim of the planned and announced inspection was to verify compliance of Pelindaba Analytical Laboratories with the following
SHEQ-INS requirements and Facility Specific Procedures:
• NIL-40: Nuclear Installation Licence.
• Decommissioning.
• Function of Decommissioning and Radioactive Waste.
• Restrictions on Dealing with the Site.
Two (2) findings and no (0) observations were raised.
Emergency ServicesNov-25The aim of the planned and unannounced inspection was to verify compliance of Calibration Pads with the following SHEQ-INS- requirements and Facility Specific Procedures:
• RD-014: Emergency Preparedness and Response Requirements for Nuclear Installations.
• SHEQ-INS-3500: Necsa Emergency Plan.
• SHEQ-INS-3010: Fire Prevention and Control Measures.
• SHEQ-INS-3070: Emergency Exercises.
There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were neither findings nor observations identified, the inspection outcomes were not graded.
RadAnalysis (NIL-37)Nov-25The aim of the planned and unannounced inspection was to verify compliance of Radioanalysis with the following Licence Conditions, SHEQ-INS- requirements and Facility Specific Procedures:
• Scope of Actions.
• Operating Technical Specification.
• Safety Documentation.
• Decommissioning.
• Examination, Inspection, Maintenance and Testing.
Six (6) findings and no (0) observations were raised.
NTP (NIL-39)Nov-25The aim of the planned and announced inspection was to assess whether systems, processes and agreements were in place and effectively implemented to ensure compliance with the following areas:
• Transport
• Financial Security
Two (2) findings and no (0) observations were raised.
SAFARI-1 RR (NIL-02)Nov-25The purpose planned and announced inspection was to verify compliance of the requirements of the following facility specific procedures:
• Operating Technical Specifications – (RR-VSK-1000).
• Irradiation of Flux Swords in the Reactor Core – (RO-OPR-1007).
• Normal start-up Procedures – (RO-OPR-1001).
Two (2) findings and no (0) observations were raised.
SAFARI-1 RR (NIL-02)Nov-25The purpose planned and announced inspection was to verify compliance to Licence Condition 10: Radioactive Waste Management, as well as the associated SHEQ-INS and facility specific documents.There were no findings raised during the inspection. The authorisation holder was found to be compliant with all aspects evaluated during the inspection. In view that there were neither findings nor observations identified, the inspection outcomes were not graded.
UCHEM (NIL-03)Nov-25The purpose unplanned and announced inspection was to verify compliance of UCHEM during the preparation and conducting of SB furnace wall thickness test against requirements detailed in SHEQ-INS docs, Licence condition as well as facility specific documentation.One (1) finding and no (0) observations were raised.
LEMS (NIL-41)Nov-25The aim of the unplanned and unannounced inspection was to verify compliance of the facility with the following NIL-41 conditions and associated
SHEQ-INS and facility-specific documentation:
• NIL-41
• Environmental protection
• Medical health surveillance
• Quality and Safety Management
• Radiological Protection
• Radioactive Waste Management
• Emergency
• Safety Documentation.
• Scope of Actions
• SHEQ Management System.
• Events Management.
Ten (10) finding and two (2) observations were raised.

There were Enforcement Actions for 2025-2026.

HEAD OFFICE

Eco Glades Office Park
Eco Glades 2Block G
Witch Hazel Avenue
Highveld Ext 75
Eco Park
Centurion

Telephone: +27 (12) 674 7100

Facsimile: +27 (12) 663 5513

E-mail: enquiry@nnr.co.za

CAPE TOWN

12 Raats Drive
Delphi Arch Building
Tableview
Cape Town
7441

P.O. Box 46055
Kernkrag
7441

Telephone: +27 (21) 553 9500

Regulatory Emergency Response Centre

Tel: +27 (12) 674 7120 (during response)

Fax: 086 742 6038

 

Stay connected